منوی دینامیک 2
 
A new record by Dana Drilling Co. in the south pars phase 16

During drilling in the phase 16 within south pars gas field, Dana Drilling Co. again succeeded to register a new record.

The drilling operation, incl. casing running 18-5/8” at the hole size 24” of well no. SPD-16-07 has taken a time of 4.70 days which is registered as a regional record for such hole size today, and for the first time performed by a private contractor company in the local oil & gas drilling sector.

 
© 2011 Dana Energy Company